Rue Liotard 62
Heavy treatment with MFP inhibitor and fixing of granite facings

Façades
2500 m²
PPE
2009
1203 Genève
Maître de l'ouvrage PPE
Direction des travaux Gerofinance - Dunand
Année de construction 1990
Travaux engagés Heavy treatment with MFP inhibitor and fixing of granite facings
Surface traitée 2500 m²
Période d'exécution 2009
Particularités Mixed facade (stone/concrete)

Write to us

    Call me back