EN
FR
DE
Newsroom
Company
Energy compliance
Thermal Insulation
Energy compliance (CECB+)
Extrerior insulation
Aerogel insulating plaster
Basements and cellars insulation
Interior insulation
Insulation for flat roofs
Facades
Safety and emergency measures
High-pressure washing
Curative and preventive treatment
Energy compliance
Anti-carbonation protection
Balcony reinforcement and compliance
Special works
Flooring and waterproofing resin
Infiltrations, injections, casings
Parking lot and basement drainage
Core drilling, masonry
Securing buildings with gondolas and acrobats
Expansion joints
Anti-graffiti
Interior transformations
Demolition
Sanitary column replacement
Plastering - Painting
Drywall
False ceiling
Floor coverings
Decontamination
Diagnosis of hazardous substances
COVID 19 disinfection
Emergency response
Asbestos removal
Joint and paint removal
Intervention on paintwork
Sealants
Emergency response
Infiltration treatment
Periodic maintenance
Technical studies of renovation procedures
Installation of all types of waterproofing
Lifelines
Emergencies
Safety
Small-scale masonry
Leak detection
Repointing
Thermal bridge control
Treatment
of building surfaces
Sandblasting, hydro-gumming, air-gumming and high-pressure washing
Graffiti removal
Sanding and acidizing
Floor polishing and cleaning
Bush hammering
Water and oil repellent
References
ENERGY COMPLIANCE
FAÇADES
SPECIAL WORK
INTERIOR TRANSFORMATIONS
DECONTAMINATION
SEALANTS
EMERGENCIES
SURFACE TREATMENT
Contact
Company
Activities
Energy compliance
Facades
Special works
Interior transformations
Decontamination
Sealants
Emergencies
Treatment
of building surfaces
Thermal Insulation
Energy compliance (CECB+)
Extrerior insulation
Aerogel insulating plaster
Basements and cellars insulation
Interior insulation
Insulation for flat roofs
Safety and emergency measures
High-pressure washing
Curative and preventive treatment
Energy compliance
Anti-carbonation protection
Balcony reinforcement and compliance
Flooring and waterproofing resin
Infiltrations, injections, casings
Parking lot and basement drainage
Core drilling, masonry
Securing buildings with gondolas and acrobats
Expansion joints
Anti-graffiti
Demolition
Sanitary column replacement
Plastering - Painting
Drywall
False ceiling
Floor coverings
Diagnosis of hazardous substances
COVID 19 disinfection
Emergency response
Asbestos removal
Joint and paint removal
Intervention on paintwork
Emergency response
Infiltration treatment
Periodic maintenance
Technical studies of renovation procedures
Installation of all types of waterproofing
Lifelines
Safety
Small-scale masonry
Leak detection
Repointing
Thermal bridge control
Sandblasting, hydro-gumming, air-gumming and high-pressure washing
Graffiti removal
Sanding and acidizing
Floor polishing and cleaning
Bush hammering
Water and oil repellent
References
ENERGYCOMPLIANCE
FAÇADES
SPECIALWORK
INTERIORTRANSFORMATIONS
DECONTAMINATION
SEALANTS
EMERGENCIES
SURFACETREATMENT
Contact
EN
FR
DE
Newsroom
Rue Tronchin 30
Rehabilitation of the building envelope
Façades
800 m²
PPE Tronchin
2012
1202 Genève
Maître de l'ouvrage
PPE Tronchin
Direction des travaux
Gérofinance - Dunand SA
Année de construction
1900
Travaux engagés
Rehabilitation of the building envelope
Surface traitée
800 m²
Période d'exécution
2012
Particularités
Heavily degraded molasse - CMNS guidelines
Write to us
Call me back
7am - 12pm 1:30pm - 4pm